The electrical and ancillary services design was particularly complex, reflecting the demands of a modern digital production campus. Recording studios, control rooms, editing suites and production environments required extensive audiovisual, communications and power infrastructure to support professional recording and monitoring equipment. Much of the electrical system was incorporated into a protected UPS-backed network, with dedicated technical earths provided to recording spaces and fibre reticulated to control room workstations. This infrastructure was critical to supporting reliable recording, monitoring and production activities across the campus. Powell Fenwick also coordinated the interfaces required for client-supplied recording, monitoring and production systems, ensuring the underlying building infrastructure could support the specialised technology used throughout the campus.
The refurbishment works presented the additional challenge of adapting existing buildings to accommodate modern recording, production and teaching environments. Wherever practical, existing services were retained and upgraded, balancing project requirements, cost efficiency and long-term performance while supporting the transformation of the wider campus.