A key feature of the project was the use of mass timber classroom structures incorporating portal frame systems, specifically designed shear walls, and LVL box beam floors. As the new internal buildings and the existing warehouse shell functioned as separate structures, each required independent seismic restraint. This added complexity to the coordination and specification of building services throughout the development.
Another challenge we faced was developing an effective heating and ventilation strategy for the school. Rather than conditioning the entire warehouse volume, a thermally efficient approach was adopted by creating a weathertight building envelope around the warehouse while insulating the individual classroom blocks. Heating was provided directly to the occupied learning spaces, significantly reducing energy demand compared with conditioning the full warehouse enclosure. The ventilation strategy was equally innovative as fresh air was supplied directly to classrooms and occupied areas, before transferring into the surrounding warehouse environment. The warehouse was maintained at positive pressure to minimise air ingress from outside helping to stabilise the warehouse environment.
The completed campus achieved a 4 Star Green Star Design & As Built v1.0 rating, becoming the first high school in New Zealand to receive this certification. The project stands as an example of how innovative design, sustainability and adaptive reuse can create lasting value for both students and the wider community.