240219 SR MC 159
Shape

Marian College, Christchurch

$50MValue
10,000m2Scale
2023Year Completed
240112 A TKF 134
240112 A TKF 142

Following the Christchurch earthquakes, Marian College faced the challenge of finding a permanent new home for its school community. Rather than constructing a traditional school campus, an innovative decision was made to repurpose an unused industrial warehouse, transforming it into a modern educational environment designed to support learning, wellbeing, and community connection.

The redevelopment delivered six two-storey classroom blocks accommodating 26 classrooms, with the library, administration, pastoral care and performing arts facilities incorporated within these buildings. Additional campus facilities included a chapel, atrium spaces, indoor and outdoor gathering areas, and four multi-purpose indoor courts.

Our team provided structural, mechanical, electrical, sustainability and seismic restraint engineering services throughout the project. Before the school facilities could be constructed, the existing warehouse structure required significant strengthening works to ensure it was suitable for its new purpose.

The project's innovative approach presented several unique engineering challenges. By introducing an entire school environment within an existing industrial structure, the design and construction process required bespoke solutions and close collaboration between disciplines. Our structural team maintained extensive involvement throughout construction to ensure the design intent was successfully delivered.

240112 A TKF 130
240219 SR MC 151

A key feature of the project was the use of mass timber classroom structures incorporating portal frame systems, specifically designed shear walls, and LVL box beam floors. As the new internal buildings and the existing warehouse shell functioned as separate structures, each required independent seismic restraint. This added complexity to the coordination and specification of building services throughout the development.

Another challenge we faced was developing an effective heating and ventilation strategy for the school. Rather than conditioning the entire warehouse volume, a thermally efficient approach was adopted by creating a weathertight building envelope around the warehouse while insulating the individual classroom blocks. Heating was provided directly to the occupied learning spaces, significantly reducing energy demand compared with conditioning the full warehouse enclosure. The ventilation strategy was equally innovative as fresh air was supplied directly to classrooms and occupied areas, before transferring into the surrounding warehouse environment. The warehouse was maintained at positive pressure to minimise air ingress from outside helping to stabilise the warehouse environment.

The completed campus achieved a 4 Star Green Star Design & As Built v1.0 rating, becoming the first high school in New Zealand to receive this certification. The project stands as an example of how innovative design, sustainability and adaptive reuse can create lasting value for both students and the wider community.

231214 SR MC 056
240112 A TKF 141

Related Projects

View all projects
New Building MAR26 Aerial 7
Accommodation, Hotels and Tourism
StructuralMechanicalElectricalCivilHydraulics
DJI 0323 PE
Aquatic and Sports Facilities
MechanicalElectricalCivilHydraulicsAcoustic
Copyright Neil Macbeth
Education
MechanicalElectricalFireCivilHydraulicsSustainability
Crown Infrastructure Delivery Parakiore Recreation and Sport Centre Poolside Seats 7
Aquatic and Sports Facilities
Aquatics
DJI 20250116201058 0283 D D4
Public Buildings
MechanicalElectricalFireHydraulicsAcoustic
IKON CAF 00110
Healthcare
MechanicalElectricalFireCivilHydraulics
251128 SA FR 063
Residential
Structural
Te Rangihiroa Exterior
Accommodation, Hotels and Tourism
MechanicalElectricalFireHydraulicsAcousticSustainability